Work Schedule

 

 

Work in the NW section consists of Grading, Scooping ditches, Mowing  and Cutting, Trimming and Chipping

 

Work in the SE section consists of Grading and Patching pot holes

 

Work in the SW section consists of Milling a road

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will assist with Cutting, Trimming and Chipping in the NW

 

1 Squad will be picking up trash in the SW

 

1 Squad will be assisting with traffic control in the NW

 

 

! Squad from The Transition House (3 people) will be assisting patching pot holes