Tentative Work Schedule

October 17, 2019

 

Work in the NE section consists of Building a Head Wall on NE 19th Ave.

 

Work in the NW section consists of Grading NW 41st Ave., Dig out the Outfall ditch on NW CR 225 and Mow NW CR 125

 

Work in the SE section consists of Watering and Packing the parking lot and walking path in Lincoln City Park

 

Work in the SW section consists of Grading SW 101st Ave., SW 106th Ave., SW 104th Ave. and SW 105th St.

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Picking up trash and weed eating SW 64th Ave.

 

1 Squad will be Assisting in building a head wall on NE 19th Ave.

 