Work Schedule

 

Work in the NW section consists of Zipping a road, Ditch work, Pulling ditches and Patching pot holes

 

Work in the SE section consists of Grading and Mowing

 

Work in the SW section consists of Cutting, Trimming and Chipping trees & brush

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting in Cutting, Trimming & Chipping trees and brush in the SW section

 

1 Squad will be directing traffic in the NW section

 

 

1 Squad from The Transition House (3 people) will be assisting in patching pot holes in the NW section