Tentative Work Schedule

May 2, 2019

 

Work in the NE section consists of Mowing NE CR 225

 

Work in the NW section consists of Digging and re-working the ditch at 6013 NW CR 225 at the intersection with NW CR 225A

 

Work in the SE section consists of Installing 2 culverts at 6120 Navarre Ave. (SE CR 18)

 

Work in the SW section consists of Grading & Packing SW 106th Ave., Grading SW 66th Ave. & SW 101st Ave., Mowing SW CR 231 and Trimming and Chipping SW 132nd Ave.

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Picking up trash and Weed eating on SW CR 231 

 

1 Squad will be Digging and re-working the ditch at NW CR 225 and NW CR 225A (6013 NW CR 225)

 

1 Squad will be directing traffic for installation of 2 culverts at 6120 Navarre Ave. in Hampton (SE CR 18)