Tentative Work Schedule

 

Work in the NW section consists of Limerocking NW 267th St., Clean out ditch on NW 53rd Ave. and Cut and trim trees on NW 223rd St.

 

Work in the SE section consists of Milling SE 66th St. and Digging ditches in Lincoln City

 

Work in the SW section consists of Patching a washout at Butler Road and 155th and pot holes in Crosby Lake area (SW 64th)

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will be picking up trash and weed eating on SE CR 21B

 

1 Squad will be trimming, cutting and chipping trees on NW 223rd St

 

1 Squad will be patching pot holes at the Crosby Lake area and patching a washout at Butler Road and SW 155th St.