Tentative Work Schedule

April 25, 2023

 

Work in the NE section consists of Cleaning out Ditches on NE 21st Ave.

 

Work in the NW section consists of Grading NW 211th St. and Mowing NW 55th Ave., NW 59th Loop and NW 177th St.

 

Work in the SE section Consists of Grading SE 33rd St., SE 43rd, SE 41st and SE 86th and Mowing SE 144th St., SE CR 100A and SE 44th Ave.

 

Work in the SW section consists of Grading SW 64th, SW 65th, SW 66th and SW 162nd and Patching Shoulders on SW CR 18