Work Schedule

 

Work in the NE section consists of Grading

 

Work in the NW section consists of  Grading, Mowing and Chipping

 

Work in the SE section consists of Grading, Chipping and Building a head wall at a bridge

 

Work in the SW section consists of fixing wash outs

 

 

We received 1 DOC Squad with 7 people and they worked in the NW section Chipping

 

1 Squad from the Transition House worked on building the head wall at a bridge in the SE section of the county