Tentative Work Schedule

June 1, 2021

 

Work in the NE section consists of Grading Dirt Roads in the NE section and Patching Pot Holes on NE 20th Ave. and NE 17th Ave.

 

Work in the NW section consists of Grading Dirt Roads in the NW section and Adding Limerock to the Intersection of NW 203rd Way

 

Work in the E section consists of Grading Dirt Roads in the SE section and Filling in Pot Holes with Limerock and Grading SE 18th Lane

 

Work in the SW section consists of Grading Dirt Roads in the SW section, Mowing ROW on SW 175th Ave., Mowing SW CR 235 and SW CR 231 and Mowing and Weed eating SW 161st.

 

 

We received 1 DOC Squad (BCSO-JAIL) with 4 inmates and they will be picking up trash and weed eating NW CR 225