Tentative Work Schedule

March 22, 2021

 

Work in the NE section consists of Installing a culvert on NE 213th St. and Cutting up and Picking up a tree across the road on NE 24th Loop

 

Work in the NW section consists of Grading NW 41st Ave. and NW 35th Ave., Mowing ROW on NW 233rd St. and Picking up debris on NW 233rd St.

 

Work in the SE section consists of Grading SE 4th, SE 58th, SE 2nd and SE 1st and Mowing SE 109th St. and SE 21st Ave.

 

Work in the SW section consists of Grading SW 147th and SW 120th and Mowing SW CR 225 and SW CR 18

 

 

We received 1 DOC Squad for a total of 5 people

 

1 Squad will be Picking up trash and weed eating on SE 109th St. and SE 21st Ave.