Tentative Work Schedule

March 29, 2021

 

Work in the NE section consists of Watering NE 204th St. and Opening up culverts on NE 218th St.

 

Work in the NW section consists of Grading NW 178th Loop, Watering NW 185th and Mowing NW CR 229 and NW CR 229A

 

Work in the SE section consists of Shoulder work and filling in troughs on SE CR 221 and Mowing around mailboxes, signs and guardrails on SE CR 18 and SE CR 221 with the Zero Turn Mower

 

Work in the SW section consists of Grading SW 105th and SW 66th Ave.

 

 

We received 3 DOC Squads for a total of 10 people

 

1 Squad will be Picking up trash and weed eating NW CR 229

 

1 Squad will be Picking up trash and weed eating SE CR 100A

 

1 Squad will be assisting with Traffic Control for Shoulder Work on SE CR 221