Tentative Work Schedule

March 18, 2019

 

Work in the NW section consists of Digging the ditch on NW 53rd Ave. (Cooksey)

 

Work in the SE section consists of Installing 3 culverts on SE 44th Ave. and Chipping up a tree on SE 53rd

 

Work in the SW section Grade Milling & Pack SW 92nd St. and Fix Guardrails on SW 106th Ave.

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be assisting with fixing Guardrails on SW 106th Ave.

 

1 Squad will be Picking up trash and weed eating NE CR 225, NE 216th, NE 219th & NE 10th 

 

1 Squad will be handling traffic control for installing 3 culverts on SE 44th Ave.