Tentative Work Schedule

November 24, 2021

 

Work in the NW section consists of Grading NW 198th St. Lowering Culverts and Dig Ditch on NW CR 225A and Patch Pot Holes on NW 184th

 

Work in the SE section consists of Grading SE 49th Ave. and Prepping SE 2nd Ave. and SE 5th Ave.

 

Work in the SW section consists of Grading SW 136th and SW 155th and Mowing SW CR 225 and SW CR 18

 

 

We received 1 DOC (BCSO-JAIL) Officer and 2 Inmates that will be Picking up Trash and Weed Eating on SW CR 227 and SW CR 225