Tentative Work Schedule

April 1, 2021

 

Work in the NE section consists of Mowing ROW on NE 17th Ave. and Mowing NE CR 225 and NE CR 125

 

Work in the NW section consists of Grading NW 71st Ave., Opening up Culverts on NW 84th Ave. and NW CR 229A and Mowing NW CR 125

 

Work in the SE section consists of Grading SE 49th Ave., Patching a trough on SE 8th Ave. and Chipping debris at the Old Landfill 

 

Work in the SW section consists of Grading SW 66th Ave. and Picking up downed trees on SW CR 237

 

 

We received 2 DOC Squads for a total of 5 people

 

1 Squad will be Cleaning up the fence line at the Old Landfill

 

1 Squad will be assisting with Patching a trough on SE 8th Ave

 