Tentative Work Schedule

March 24, 2021

 

Work in the NE section consists of Mowing the ROW on NE 223rd St.

 

Work in the NW section consists of Grading NW 198th St. and NW 71st Ave.

 

Work in the SE section consists of Opening up culverts on SE CR 21B, Mowing SE 150th St. and SE 154th St. and Mowing with the Zero Turn trimming around signs, mailboxes and guardrails on SE CR 18

 

Work in the SW section consists of Grading SW 101st Ave., Picking up old culvert on SW 132nd Ave. that was replaced and Mowing with the Zero Turn trimming around signs, mailboxes and guardrails on SW CR 18

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Picking up trash and weed eating on SE 21st Ave. and SE CR 100A

 

1 Squad will be Picking up trash on NW 71st Ave. between NW 180th and NW CR 229 and on NE 19th Ave.