Tentative Work Schedule

September 12, 2018

 

Work in the NW section consists of Grading Whitehead Settlement area, Grading NW 38th (a milled road), NW 233rd St, NW 42nd Ave., Replacing Crossover pipes on NW 216th, Pulling ditches on NW 41st, Patching pot holes on NW 105th, Digging the ditch on NW 53rd Ave., Mowing in the Pleasant Grove and Morgan Road area, Mowing NW 219th, 212th and 80th with the Side Arm mower and Blowing out culverts on NW 203rd.

 

Work in the SE section consists of Grading Crystal Lake Homesite area

 

Work in the SW section consists of Laying Sod at 9118 SW CR 225A

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will be laying Sod on SW CR 225A

 

1 Squad will be assisting in replacing Crossover pipes on NW 216th St.

 

1 Squad will be patching pot holes on NW 105th