Tentative Work Schedule

Work in the NE section consists of Patching Pot Holes on NE 236th St.

 

Work in the NW section consists of Cleaning pout the ditch on NW 53rd Ave., Cutting & Trimming and Chipping trees on NW 223rd St., Picking up and Chipping tree that fell at the bridge on NW CR 229, Replacing Crossover pipe on NW 193rd St.

 

Work in the SE section consists of Grading SE 49th, 86th and 61st, Patching pot holes on SE 25th Lane and 16th St and Milling SE 66th St

 

Work in the SW section consists of Grading SW 66th, Installing culvert on SW 80th Pl., Mowing with the Side Arm Mower on SW CR 231, SW 247th and off SW CR 18 and Patching pot holes on SW CR 225 & 227

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be patching pot holes on SE 25th Lane. SE 16th St., NE 236th St. and SW CR 225 & 227

 

1 Squad will be picking up trash and weed eating in the Keystone Golf and Country Club at the Delos Pond and the retention pond on SE 46th Loop

 

1 Squad will be picking up trash and weed eat on SE CR 18