Tentative Work Schedule

September 10, 2018

 

Work in the NE section consists of Mowing NE 17th, 19th, 173rd and 28th

 

Work in the NW section consists of Installing Crossover pipes on NW 216th St., Pulling ditches on NW 41st and 44th, Digging the ditch on NW 53rd and Patching pot holes by 5916 NW CR 225.

 

Work in the SE section consists of Patching holes and Grading SE 8th Ave. and SE 55th Ter.

 

Work in the SW section consists of Spreading limerock and Grading SW 68th and Mowing SW 75th Ave

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be assisting with replacing Crossover pipes on NW 216th St

 

1 Squad will be laying SOD at 9118 SW CR 225A

 

1 Squad will be Patching holes by 5916 NW CR 225