Tentative Work Schedule

January 22, 2024

 

Work in the NE section consists of Grading NE 247th St., Paul Lane and Roads off of 301 heading South

 

Work in the NW section consists of Grading NW 257th St. and Roads off of 301 heading South and Patching Pot Holes on NW CR 235

 

Work in the SE section consists of Grading SE 59th Ave., SE 125th Terrace and SE 129th St.

 

Work in the SW section consists of Grading SW 127th Ave. and SW 130th Pl

 

We will also be Loading and Hauling Dirt to the New River Landfill