Tentative Work Schedule

January 10, 2019

 

 

Work in the NE section consists of Grading NE 173rd St. and Patching pot holes on NE 26th Ave.

 

Work in the NW section consists of Grading NW 185th St. and Install culverts at NW CR 229 and NW 180th Way

 

Work in the SE section consists of Patching pot holes on SE 2nd Ave. and Grading Crystal Lake Homesite area

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Patching pot holes on SE 2nd Ave.

 

1 Squad will be working at the Shop

 

1 Squad will be directing traffic for installing culverts on NW CR 229 & NW 180th Way