Tentative Work Schedule

December 22, 2020

 

Work in the NW section consists of Shoulder work on NW CR 225

 

Work in the SE section consists of Prepping and Spraying SE 5th Ave. and SE 43st St.

 

Work in the SW section consists of Grading SW 163rd St., Patch pot holes and the side of the road on SW CR 235, Mowing SW CR 18 and SW CR 231 (Dedan Loop) and Patching a driveway (6978) on SW CR 18.

 

 

We did not receive any DOC Squads today.