Tentative Work Schedule

October 10, 2018

 

Work in the NW section consists of Filling in holes and adding limerock to NW 179th, Pulling ditches and filling holes on NW 75th, Mowing NW 75th with the Side Arm

 

Work in the SW section consists of Digging ditches on SW 161st and adding limerock to a driveway on SW 161st, Finish Installing a culvert on SW 80th PL and Blowing out culverts

 

 

We did not receive any DOC Squads due to Hurricane Michael