Tentative Work Schedule

March 26, 2019

 

Work in the NE section consists of Grading NE 171st St., NE 12th Ave., NE 5th, NE 19th Ave & NE 21st Ave.

 

Work in the NW section consists of Grading NW 178th Loop, Whitehead Settlement, NW 127th Ave. and Digging the ditch on NW 53rd Ave.

 

Work in the SE section consists of Grading  SE 16th Ave. and Crystal Lake Homesites and Installing a culvert at 2378 SE 43rd 

 

Work in the SW section consists of Installing a culvert on SW CR 100A, Patching pot holes in the City of Brooker, Filling in shoulders on SW CR 18 and Grading SW 130th Pl.

 

 

We received 3 DOC Squads for a total of 14 people 

 

1 Squad will be Picking up trash and weed eating on NW CR 225 (from 301 to SR 100)

 

1 Squad will be Patching pot holes in the City of Brooker

 

1 Squad will be handling traffic control for installing culverts on SE 43rd St. & SW CR 100A