Tentative Work Schedule

July 2, 2019

 

Work in the NE section consists of Grading NE 5th and NE 171st

 

Work in the NW section consists of Grading NW 219th and Cleaning out a ditch on NW CR 225

 

Work int he SE section consists of Grading SE 125th Ter., SE 129th St., SE 135th, SE 49th, SE 86th, SE 61st, Dig ditch on SE CR 21B, Patch pot holes on SE 48th Ave. and Mow in the Keystone Golf & Country club area, SE 57th & SE 109th.

 

Work in the SW section consists Grading SW 66th, Installing a culvert on SW 104th St. and Mowing SW 132nd Ave.

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Picking up trash on SE 21st Ave. and SE CR 230A

 

1 Squad will be Picking up trash on SE 109th St.

 

1 Squad will be directing traffic for Digging ditches on SE CR 21B and Installing a culvert on SW 104th