Work Schedule

 

Work in the NE consists of Ditch work and Cutting, Trimming and Chipping

 

Work in the NW consists of Ditch work, Take down tree and Grade

 

Work in the SE consists of Zipping a road and Patching driveways

 

Work in the SW consists of Grading and Mowing

 

 

We received 2 DOC Squads for a total of 12 people

 

1 Squad will assist in Cutting, Trimming and Chipping in the NE section

 

1 Squad will assist with traffic control in the NE section

 

 

Received 1 Squad from The Transition House (3 people) will assist with Patching driveways