Tentative Work Schedule

October 6, 2020

 

Work in the NE section consists of Mowing ROW on NE 204th St.

 

Work in the NW section consists of Grading NW 205th, NW 178th Loop and NW 267th, Patching Pot Holes on NW 177th, NW 62nd and NW 200th and  Cleaning our high spots in ditches and Opening up Crossover pipes on NW 196th St

 

Work in the SE section consists of Grading SE 84th, SE 16th and SE 94th

 

Work in the SW section consists of Trimming trees and Chipping on SW CR 227 & SW CR 235, Chipping on SW CR 18 and Mowing SW CR 235, SW 161st and SW 144th

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be assisting with Chipping on SW CR 227 & SW CR 235

 

1 Squad will be assisting with Chipping on SW CR 18