Tentative Work Schedule

December 2, 2020

 

Work in the NW section consists of Grading NW 35th Ave., Shoulder work on NW CR 225, Mowing ROW on NW 48th Ave. and Patching a trough on NW CR 225 near the Alligator Farm and Patching a driveway at 19729 NW 71st Ave.

 

Work in the SE section consists of Grading SE 49th Ave. (South of SE CR 18) and Patching Pot Holes in the Keystone Golf and Country Club and on SE 59th Ave.

 

Work in the SW section consists of Mowing SW CR 231 and SW CR 237

 

 

We received 3 DOC Squads for a total of 9 people

 

1 Squad will be Picking up trash and weed eating NW CR 125, NE CR 125, NE 28th Ave. and NE 7th Ave.

 

1 Squad will be Picking up trash and weed eating SW CR 18, Around Hampton Lake and on SW CR 227

 

1 Squad will be assisting with Patching a hole near the Alligator Farm, Holes in a driveway at 19729 NW 71st Ave., Pot Holes on the roads in the Keystone Golf and Country Club and on SE 59th Ave.