Tentative Work Schedule

February 20, 2019

 

Work in the NW section consists of Grading NW 51st Ave. and roads off NW CR 233, Patching pot holes on NW 219th St. off NW CR 225 and digging the ditch on NW CR 235 (Nettle's Ditch)

 

Work in the SE section consists of Grading & Packing SE 46th Loop and Grading SE 31st St.

 

Work in the SW section consists of Putting water down and Packing SW 106th Ave., Scooping concrete Ditch at Hampton Lake Boat Ramp (SW 69th St.) and Patching troughs on SW CR 235

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be Patching troughs on SW CR 235

 

1 Squad will be directing traffic for Scooping a Concrete Ditch at the Hampton Lake Boat Ramp (SW 69th St.)