Tentative Work Schedule

August 10, 2023

 

Work in the NE section consists of Mowing the Shoulders of the Road on NE 20th Lane and NW 24th Lane and Mowing the sidewalks on both sides of NE CR 225

 

Work in the NW section consists of Grading NW 41st Ave., NW 44th Ave. and NW 35th Ave., Installing a Culvert at Florida State Prison and Mowing the Shoulders of the Road on NW 205th

 

Work in the SE section consists of Grading SE 126th St., SE 134th and SE 140th

 

Work in the SW section consists of Grading SW 136th St., SW 155th Ave. and SW 144th and Mowing SW CR 231, SW 175th St. and SW CR 237

 

 

We received 2 DOC (BCSO-JAIL) Officers and 3 Inmates and they will be Picking Up Trash that was thrown out near the Collection site on SW CR 18 and Mowing around the Guardrails on SW CR 18