Work Schedule

 

Work in the NE section consists of Patching driveways and troughs

 

Work in the NW section consists of Grading, Mowing, Limerocking a road, Installing a driveway culvert and cut up, trim and chip

 

Work in the SE section consists of Grading

 

Work in the SW section consists of Limerocking a road, Installing a driveway culvert and Repair Private Roads

 

 

We received 2 DOC Squads for a  total of 12 people

 

1 Squad will be assisting in changing light bulbs and Cutting up, Trimming and Chipping

 

1 Squad will assist in traffic control installing driveway culverts