Tentative Work Schedule

February 7, 2022

 

Work in the NE section consists of Cleaning out a ditch on NE 19th Lane and Pick up trash on NE CR 225

 

Work in the NW section consists of Grading NW 211th St.

 

Work in the SE section consists of Grading SE 11th Ave. and Clean out the Concrete Ditches on SE 5th Ave.

 

Work in the SW section consists of Grading SW 106th Ave. and Repairs and Clean up Bridge site on SW CR 230 (Dedan Loop)

 

 

We received 1 DOC (BCSO-JAIL) Officer and 3 Inmates and they will be assisting with Clean up on SW CR 231 (Dedan Loop)`