Tentative Work Schedule

July 28, 2021

 

Work in the NW section consists of Grading the Dirt part of NW 71st, NW 188th and NW 193rd, Patching Pot Holes on NW 223rd and NW 38th (off of NW 216th), Picking up Tree Debris on NW 196th and Mowing NW CR 225 and NW CR 125

 

Work in the SE section consists of Grading SE 38th and SE 49th, Patching Pot Holes on SE 52nd, Weed eating the Guardrail ditch on SE 150th St. and Mowing the Outfall ditch on SE 150th St.

 

Work in the SW section consists of Grading SW 114th and SW 147th, Picking up Tree Debris on SW CR 235 and SW 155th and Mowing SW 75th Ave, and SW CR 100A

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 5 Inmates

 

1 Squad of 3 Inmates will be Weed eating and Cleaning out Concrete Ditches on SW 161st

 

1 Squad of 2 Inmates will be Picking up trash on NW CR 225, starting at NW CR 225A and going to SR 100