Tentative Work Schedule

July 31, 2018

 

Work in the NW section consists of Applying Dirt and Limerock to NW 41st Ave., Pulling Ditches on NW 71st Ave. and Installing a culvert at 6875 NW 219th Terrace

 

Work in the SE section consists of Grading SE 46th Loop and SE 94th St. and Adding Concrete bags to ditch to slow the water flow on SE 66th St

 

Work in the SW section consists of Adding Clay and Enzymes to SW 101st Ave. and Installing a culvert at 10249 SW CR 18

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Adding Concrete bags to ditch to slow water down on SE 66th St.

 

1 Squad will be picking up trash and weed eating on SW CR 18 from 301 to Brooker

 

1 Squad will be conducting traffic control for installing a culverts at 10249 SW CR 18 and 6875 NW 219th Terrace