Tentative Work Schedule

January 29, 2019   REVISED AT 11:00AM

 

Work in the NE section consists of Filling in and Grading NE 187th St., Grade SE 11th, Dig Ditch on NE 17th Ave. and Cut ROW with Side Arm on Carter Road (NE 6th Ave. and NE 227th)

 

Work in the NW section consists of Grading NW 41st 

 

Work in the SW section consists of Grading SW 106th, SW 104th, SW 101st and SW 85th Lane with the Road Boss and Grading SW 160th Ave., SW 155th Ave. and SW 136th St.

 

We did not receive any DOC Squads today

 

*****REVISED*****

 

WE RECEIVED 2 DOC SQUADS FOR A TOTAL OF 12 PEOPLE

 

1  SQUAD WILL BE PICKING UP TRASH AND WEED EATING ON SW CR 18 STARTING AT 301 AND GOING TOWARDS BROOKER

 

1 SQUAD WILL BE PICKING UP TRASH AND WEED EATING ON NW CR 229