Tentative Work Schedule

December 13, 2018

 

Work in the NE section consists of Moving equipment to begin to mix materials into milling on NE 204th St and Grade NE 171st St. with the Road Boss

 

Work in the NW section Cut out limerock and get ready to pave NW 216th St., Grade and Mow NW 71st Ave. (Mow all 3 sections) with the Side Arm Mower, Mow NW 74th with the Side Arm Mower, Patch Pot holes on NW 188th, NW 27th Ave., NW 56th Lane and NW 37th Ave. off Morgan Road an Grade NW 38th Ave.with the Road Boss

 

Work in the SE section consists of Grading SE 50th St. & SE 51st St. and Patching Pot holes on SE 52nd St.

 

Work in the SW section consists of Digging a ditch on Edwards Road

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Patching Pot holes on SE 52nd St.

 

1 Squad will be digging a ditch on Edwards Road

 

1 Squad will be directing traffic on NW 216th St.