Tentative Work Schedule

May 16, 2022

 

Work in the NW section consists of Grading NW 219th St. and NW 211th Ave. and Mowing NW CR 225

 

Work in the SE section consists of Grading SE 11th Ave., Cleaning Ditches on SE 94th St. and Patch Pot Holes SE 48th Ave.

 

Work in the SW section consists of Grading SW 132nd Ave. and SW 155th and Mowing ROW on SW 82nd Ave.

 

We will be Patching a spot in the asphalt at the Truck Driving Range

 

 

We received 1 DOC (BCSO-JAIL) Officer with 3 Inmates and will be assisting with patching the asphalt at the Truck Driving Range