Tentative Work Schedule

July 13, 2023

 

Work in the NW section consists of Grading NW 219th St., NW 74th and NW 215th Way and Mowing the Sidewalk on NW CR 229 with the Zero Turns

 

Work in the SE section consists of Grading SE 125th Ter., SE 129th St. and SE 12th Ave.,  Add Extension to a Culvert and Clean out a Ditch on SE 26th Ave. and Mow Theressa Fire Department with the Zero Turns

 

Work in the SW section consists of Grading SW 155th, SW 162nd Ter. and SW 163rd St., Mow SW CR 231, SW 175th, SW CR 237 and Mow Shoulders of the Road on SW CR 227

 

We received 1 DOC (BCRD-JAIL) Officer and 4 Inmates and they will be Picking up Trash on SW CR 231 (Dedan Loop)