Tentative Work Schedule

March 11, 2021

 

Work in the NE section consists of Grading NE 247th St. and Patching Pot Holes on NE 17th Ave.

 

Work in the NW section consists of Grading NW 219th Tr. and NW 70th Ave. and Mowing ROW on NW 132nd Pl.

 

Work in the SE section consists of Grading SE 75th Ave. and SE 49th Ave.

 

Work in the SW section consists of Pouring concrete at the Sampson Lake Boat Ramp on SW 75th Ave., Cleaning out the ditch on SW 194th Ave. and Mowing SW CR 18 and SW CR 227

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Assisting with Pouring concrete at the Sampson Lake Boat Ramp

 

1 Squad will be assisting with Patching Pot Holes on NE 17th Ave.