Tentative Work Schedule

February 18, 2019

 

Work in the NE section consists of Patching a driveway at  2170 NE 204th Lane 

 

Work in the NW section consists of Grading NW 228th St., Grading NW 55th, NW 52nd, NW 177th & NW 62nd with the Road Boss and .Digging the ditch on NW CR 235 (Nettle's ditch)

 

Work in the SE section consists of Adding milling and limerock to SE 46th Loop, Filling in the ditch that was dug across SE 20th Lane and Installing a culvert on SE 2nd Pl. (in Crystal Lake Homesites) 

 

Work in the SW section consists of Patching troughs on SW CR 235 and Grading SW 85th & SW 101st with the Road Boss

 

 

We received 3 DOC Squads for a total of 18 people

 

 

1 Squad will be Patching a driveway at 2170 NE 20th Lane and then Patching troughs on SW CR 235

 

1 Squad will be Weed eating and Picking up trash on NW CR 225, starting on the SR 100 end

 

1 Squad will be Installing a culvert on SE 2nd Pl.