Tentative Work Schedule

September 17, 2020

 

Work in the NE section consists of Grading NE 6th Ave. and Installing a culvert on NE 227th St.

 

Work in the NW section consists of Cutting and Trimming NW 44th Ave. and Cleaning iout ditches oin NW 251st St.

 

Work in the SE section consists of Grading Volkswagon Dr. in Hampton and Mowing SE 21st Ave., SE 144th St. and SE CR 100A

 

Work in the SW section consists of Grading SW 92nd and Chipping and keeping limbs off of SW CR 231 (Dedan Loop)

 

 

We received 2 DOC Squads for a total of 9 people

 

Both Squads will be working with the Chipping Crew keeping limbs off of roadway