Tentative Work Schedule

May 9, 2019

 

Work in the NE section consists of Zipping NE 7th Ave. and Trimming a tree on NE 28th Ave.

 

Work in the NW section consists of Picking up a tire on NW 28th Ave. and Picking up car parts out of the creek on NW 22nd Ave.

 

Work in the SE section consists of Grading roads off SE CR 100A, SE 140th, SE 134th, SE 126th & SE 129th

 

Work in the SW section consists of Mowing (with Zero Turns) SW CR 235, SW 161st and SW CR 231, Pick up tires o SW 168th St and Dig the ditch on SW CR 18 at SW CR 231 (Dedan Loop)

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will be directing traffic on SW CR 18 & SW CR 231(Dedan Loop)

 

1 Squad will be Picking up car parts on NW 22nd Ave and Picking up tires on SW 168th St and Trimming trees on NE 28th Ave.