Tentative Work Schedule

March 7, 2019

 

Work in the NE section consists of Grading NE 171st, NE 5th and NE 21st Lane

 

Work in the NW section consists of Grading NW 219th St., Ditch work on NW 53rd Ave., Install culverts on NW CR 125 and at 3977 NW CR 225 and Patch a driveway at 5262 NW 177th St.

 

Work in the SE section consists of Patching troughs on SE CR 21B

 

Work in the SW section consists of Packing SW 101st Ave. and Sampson City VFD and Grading SW 168th

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Patching a driveway at 5262 NW 177th St.

 

1 Squad will be Picking up trash and Weed eating SW CR 100A (Starting on the SR 100 end)

 

1 Squad will be Installing culverts on NW CR 125 and 3977 NW CR 225  

 