March 13, 2019

 

Work in the NW section consists of Finish Grade and Pack NW 219th St., Patch pot holes on Cut thru road from NW 200A to 301, patch troughs on SW CR 235 and Dig NW 53rd Ave. ditch

 

Work in the SE section consists of Pulling up a culvert and Digging ditches on SE 44th (Lincoln City)

 

Work in the SW section consists of Grading & Packing SW 106th Ave., Grading SW 132nd Ave., Install culvert on Dedan Loop (next to 14736 SW CR 231) and Patch pot holes on SW CR 235

 

 

We received 2 DOC Squads for a total of 10  people

 

 

1 Squad will be Patching pot holes on SW CR 235 and the cut through road between NW CR 200A  and 301 on SE 44th (Lincoln City)

 

1 Squad will be digging ditches on on SE 44th (Lincoln City) and Install a culvert next to 14736 SW CR 231 (Dedan Loop)  

 

 

We also picked up the Used Water truck from Kenneth Blackburn