Tentative Work Schedule

January 3, 2019

 

Work in the NE section consists of Grading NE 171st and Patching pot holes on NE 17th Ave.

 

Work in the NW section consists of Grading NW 25th, NW 238th, NW 251st, NW 267th, NW 261st & NW 63rd and Installing a culvert at 7915 NW 261st St.

 

Work in the SE section consists of Grading SE 11th Ave. and Patching pot holes on SE 28th St.

 

Work in the SW section consists of Grading SW 160th, SW 114th, SW 180th, SW 92nd, SW 66th Ave. and SW 106th

 

 

We received 3 DOC Squads for a total of 12 people

 

1 Squad will be Patching pot holes on SE 28th St.

 

1 Squad will be Patching pot holes on NE 17th Ave.

 

1 Squad will be picking up trash and weed eating on NE 185th St.