Tentative Work Schedule

August 20, 2019

 

Work in the NE section consists of Grading & Packing NE 204th

 

Work in the NW section consists of Grading NW 41st Ave. and Mowing NW 214th St., NW CR 125, NW 27th and NW CR 225

 

Work in the SE section consists of Cleaning out the outfall  ditches on SE CR 100A

 

Work in the SW section consists of Grading and limerocking SW 179th St., Grading NW 41st, NW 44th, NW 209th and 35th, Patching pot holes at 7434 & 7422 SW CR 225, Cleaning out the outfall ditch on SW CR 237 and Mowing SW 114th

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Picking up trash and Weed eating NE CR 225

 

! Squad will be Picking up trash and Weed eating NW CR 229A

 

1 Squad will be assisting in Cleaning out the out fall ditches on SW CR 237 and SE CR 100A