Work Schedule

Work in the NE section consists of Grading

 

Work in the NW section consists of Grading, Chipping, Patching driveway and Mowing

 

Work in the SE section consists of Grading and Chipping

 

We received two (2) DOC squads for a total of 13 people

 

1 squad chipping debris in the NW section

 

1 squad chipping debris in the SE section  

 

1 squad (two people from the Transition House) patching driveways in the NW section