Tentative Work Schedule

February 21, 2019

 

Work in the NW section consists  Grading NW 50th and roads off NW CR 233, Dig Ditch on NW CR 235 (Nettles Ditch), Patch pot holes on NW 59th Loop

 

Work in the SE section consists of Patching driveways at SE CR 18 and SE CR 221

 

Work in the SW section consists of Patching troughs on SW CR 231

 

 

We received 2 DOC Squads for a total of 9 people

 

1 Squad will be Patching driveways at SE CR 118 and SE CR 221 

 

1 Squad will be working around the Shop