Tentative Work Schedule

May 11, 2022

 

Work in the NE section consists of Cleaning out the Outfall Ditch on NE 6th Ave.

 

Work in the NW section consists of Grading NW 212th St., NW 84th Ave. and NW 188th St., Cleaning out a ditch to get the water flowing on NW 216th St., Mowing NW CR 125 and NW CR 225A and Watering Down NW 84th Ave. and NW 185th.

 

Work in the SE section consists of Grading SE 136th Loop, SE 140th and SE 136th and Mowing SE 144th St.

 

Work in the SW section consists of Mowing ROW on SW 155th Ave. and Watering Down SW 101st Ave.

 

 

We received 2 DOC (BCSO-JAIL) Officers and 4 Inmates and they will be Repairing Crossover pipes on NW CR 235 and SW CR 100A (Edwards Road)