Tentative Work Schedule

April 23, 2019

 

Work in the NE section consists of Parching Pot Holes on NE 179th St.

 

Work in the NW section consists of Zipping and Grading NW 177th St. and NW 62nd Ave., Trim low limbs on NW 293rd St. and Mowing NW CR 125

 

Work in the SE section consists of Cleaning out SE 23rd Ave. ditch and Finish building a Head Wall

 

Work in the SW section consists of Grading SW 168th St. and Trimming & Chipping SW 132nd Ave.

 

 

We received 3 DOC Squads for a total of 11 people

 

1 Squad will be Trimming low hanging limbs on NW 203rd St. and Trimming and Chipping debris on SW 132nd Ave.

 

1 Squad will be Picking up trash and Weed Eating on NW CR 125

 

1 Squad will be Finishing building a Head Wall on SE 23rd Ave. then Patching Pot Holes on NE 179th St.