Tentative Work Schedule

March 11, 2019

 

Work in the NW section consists of Fill in holes and Grade NW 219th St., Dig NW 53rd Ave. ditch, Dig out ends of Crossover pipe  on NW CR 125, Patch driveways in Pleasant Grove, Patch troughs on NW CR 225 and Finish installing culvert at 3977 NW CR 225        

 

Work in the SW section consists of  Grading SW 168th       

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad  will Patching driveways in Pleasant Grove

 

1 Squad will be Picking up trash and weed eating SE 21st Ave.

 

1 Squad will be directing traffic for finishing the installation of the culvert at 3977 NW CR 225 then going to NW CR 125 to dig out the ends of the Crossover pipe