Tentative Work Schedule

June 3, 2021

 

Work in the NE section consists of Grading NE 24th Ave., Prep NE 14th Ave. and Grade Carter Road

 

Work in the NW section consists of Patching Driveways on NW CR 125 and Mowing ROW on NW 74th Ave. and NW 215th Way

 

Work in the SE section consists of Grading SE 49th Ave.

 

Work in the SW section consists of Grading SW 101st Ave., Mowing SW CR 237 and SW CR 231 and Mowing around Bridges, Signs, Guardrails, Mailboxes, Culverts and Crossover pipes on SW CR 235

 

 

We received 1 DOC Squad (BCSO-JAIL) with 4 Inmates and they will be Picking up trash, Pulling vines and weed eating on SW 175th